The JIS style scaffold double coupler is paired with steel tubes to quickly and flexibly form scaffolding systems. The coupler and the tube form a 90 degree angle. The coupler is also hot dip galvanized or electro-galvanized for corrosion resistance.
MaterialsQ235 steel
ParametersItem No. | Description | Weight |
CSJDC | JIS style double coupler | 0.58/0.65KGS |
Tube and Clamp Scaffolding Video
Our galvanized scaffolding tube fully comply with EN 39 standard, scaffolding clamp and couplers comply with EN 74-1, AS/NZS 1576, JIS A 8951 standards.
Coronet wins project of supplying thousands tons scaffolding materials to LNG project in Bantangas. All these materials are used for OSBL. We greatly appreciate the client trust since 2011. They have verified that Coronet not only maintains, but continues to improve quality levels in terms of estimated manufacturing and delivery date.
Also, we delivered another thousand tons of materials for central Java Project coal fired power plant earlier of 2019. Thanks to the client’s trust for years. We are servicing contractors and building connections all over the world.
CORONET SCAFFOLD
Coronet Group Suzhou Co.,Ltd.
CN: 5 Xinghan St., Suzhou, Jiangsu, Province
Tel.: +86-512-85557000 (CN)
USA: 26517 Highway 74 Perris CA 92570
Tel.: +1-866-300-6688 Jim Fraser
Spain: C/ Hierro, 26. P.I. Aimayr, 28330 San Martín de la Vega, Madrid
+34 910 216 999 Carlos Cano
E-mail:
coronet@coronet-scaffold.com